Split-Type Air Conditioning Installation Simplified In Three Steps

There may be many reasons you’re thinking about installing a new split-type air conditioner, whether you’ve never owned one or need to replace an older unit. While some might like to install it themselves, this is a job that’s best left up to a professional technician.

If you need an  air conditioning installation Tampa has a pool of professionals to do the job. It is highly recommended to contact a specialist to install it for you to avoid the fuss of having the machine installed incorrectly, causing damages and further costs.

Here is a brief summary of the procedure on how a technician can mount the split-type air conditioner onto walls.

  • Installation of the Compressor Unit and connecting the air conditioning lines

Proceeding from the installation of the compressor unit in the outside of the premises, the refrigerant lines are now to be connected with the use of the spanner. These connections established are made in the blower and the compressor unit. They must be ensured to secured in place and tightly gripped together but not to the point of damaging the threading. The excess tubing can be trimmed. Meanwhile, the ends need to be re-flared to allow the nuts to be recycled.

Next, the technician connects the vacuum pump using the aid of the manifold gauge towards the port of the compressor. This is to open the low pressure gauge valve. The blue-colored low pressure hose is directed to the compressor unit. The yellow hose on the other hand, goes to the vacuum pump.

Pulling the vacuum pump ideally for 30 minutes rids off the unnecessary water vapor accumulated within the copper lines. The appearance of bubbles in the oil sight glass of the pump, together with the mist indicates the discharge of the pump.

  • Application of Pressure to the valves then establishing the Electrical Connections

Low pressure gauge valve must be sealed and closed in this step. The thinner liquid line valve is the first one to be partially forming a crevice to open using the so-called Allen Key. Next to be fully opened and exposed is the gas valve. The manifold gauge will now register and maintain pressure. This signifies that the vacuum pump is now ready to be removed.

Cautiously and immediately disengage the manifold from the compressor unit for there is a tendency that the refrigerant and oil will spurt out and make a mess. The technician never dismantle the manifold without applying pressure in the lines since escaping water vapor can be sucked back into the lines. This is now where the liquid line valve is fully opened and exposed.

When it comes to an air conditioning installation Tampa residents are encouraged to contact a service professional instead of doing it themselves.

Ernest Krrohl is a technician for sliding doors and windows, air conditioning units, and HVAC. He loves to write simple steps on how to get things done without the need of elaborate processes.